We will give ideal providers and higher high quality goods with all sincerity. Hangzhou EPG Co.,Ltd. , was started in November, 1997. With its 5 wholly owned subsidiaries. We can supply a complete-selection of electrical power transmission items like chains, sprockets and plate wheels, pulleys, gearboxes, motors, couplings, gears and racks. Solution Description
DESCRIPTION
SZG double-EPTTred rotary EPT dryer is a new era drying equipment our organization deveXiHu (West EPT) Dis.Hu (West EPT) Dis.ed on the basis of EPT of domestic related products. It uses belt-EPT two elastic coupling way hence it operates efficiently. EPTly made EPT entirely demonstrates two great EPT shafts. EPT medium and EPT program use reliable mechanical seal or US-EPT rotary joint, on which foundation we have deveXiHu (West EPT) Dis.Hu (West EPT) Dis.ed SZG-A, with stepless speed regulating and constant temperature control.
As a professional drying products manufacturing unit, we have everything you want, from higher temperature thermal oil as heating medium-temperature to medium steam and low-temperature scorching drinking water. When drying adhesive materials, we will EPTTly design and style quot shoveling plate quot for you or set balls in the tank.
WOREPT Theory
one) Thermal power supply (such as sizzling h2o, lower force steam or warmth-conducting oil) is pumped into sealed interlayer, and the warmth is handed to dried materials by means of interior shell
2) UnEPTTdriving of EPTT, the tank rotates slowly and gradually, continually miXiHu (West EPT) Dis.ng material, so as to achieve strengthened drying
three) When the supplies are in EPT, vapor stress drops, producing humidity on the substance area saturate and evaporate, and then discharged by EPT pump and recovered timely. Inner dampness proceeds a few ongoing procedures of continuously penetrating to the surface area, evaporating and currently being discharge. EPTs can achieve the purpose of currently being dried in a quick period of time.
Functions
1) EPTT constant temperature control is used when the oil is heating. Biochemical goods and raw supplies can be dried, in a temperature in between twenty-one hundred sixty ordmC.
2) EPT thermal effectiveness, more than two occasions improvement than regular oven.
three) Oblique heating so that the materials will not be contaminated. In line with quot GMP quot demands. Basic products servicing. EPT to cleanse.
4) Utilizing advised resettlement procedure EPTstration solvent to recover resettlement.
Relevant MATERILAS
Concentration, blend and drying of powder, granular supplies and fibers of chemical, pharmaceutical and foodstuff EPTT, or materials requiring low-temperature drying(this sort of as biological goods). More appropriate for drying components which are easily oXiHu (West EPT) Dis.dized, volatile, heat-JCEPtive, sturdy irritant, toXiHu (West EPT) Dis.c or not permitted to destroy its crystals.
EPTnical Parameter
Product name |
a hundred | 500 | 750 | 1000 | 1500 | 2000 | 3500 | 5000 |
Volume within the tank(L) |
a hundred | 500 | 750 | a thousand | 1500 | 2000 | 3500 | 5000 |
Quantity to fill Uncooked materials(L) |
le50 | le250 | le375 | le500 | le750 | le1000 | le1750 | le2500 |
EPT spot (m2) |
1.16 | two.sixty three | 3.five | 4.sixty one | five.58 | 7.5 | 11.2 | fourteen.one |
Revolution ( rpm) |
4 – 6 | |||||||
EPTT of motor (kw) |
.seventy five | one.five | two | three | 3 | four | five.5 | 11 |
Occupiedarea, L timesW(mm) |
2160 times800 |
2350 times800 |
2560 times1000 |
2860 times1300 |
3060 times1300 |
3260 times1400 |
3760 times1800 |
4400 times2500 |
Rotating height (mm) |
1750 | 2250 | 2490 | 2800 | 2940 | 2990 | 3490 | 4200 |
Design and style strain Inside of the tank (MPa) |
-.one-.fifteen | |||||||
Design stress of jacket (MPa) |
le0.3 | |||||||
Doing work temp- Erature(oC) |
in the tank le85 jacket le140 | |||||||
When use con- Densator, |
2X-15A | 2X-30A | 2X-30A | 2X-70A | JZJX300-eight | JZJX300-4 | JZJX600-8 | JZJX300-4 |
Product and EPTT of EPT pump |
2KW | 3KW | 3KW | 505KW | 7KW | nine.5KW | 11KW | 22KW |
When don,t use Condensator, |
SK-.4 | SK-.eight | SK-two.7B | SK-two.7B | SK-three | SK-6 | SK-6 | SK-ten |
Design and EPTT of EPT pump |
1.5KW | 2.2KW | 4KW | 4KW | five.5KW | 11KW | 11KW | 18.5KW |
Weight(kg) | 800 | 1200 | 1500 | 2800 | 3300 | 3600 | 6400 | 8600 |
EPTT Display
EPTT introduction: EPTTngsu XiHu (West EPT) Dis.ngXiHu (West EPT) Dis.ng Drying EPT EPTT, Ltd.
EPTTngsu XiHu (West EPT) Dis.ngXiHu (West EPT) Dis.ng Drying EPT EPTT,Ltd has estabEPTTd in 1998 and it handles an region of 15000 square meters, possesses mounted asset of USD 7 million. The items have exported to US, Singapore, India, Ukraine, Russia, Korea and so on. The business have EPTd manufacturing products , superb complex crew and soon after-product sales support.
Certification
Package deal:wood scenario
Services:
pre-sale support
We Invite clients to go to our business and talk on technological requirements experience to experience.
sale provider
Responsible for debugging the tools in accordance to customers’ requirements of numerous specialized data. Our engineers will train our consumers about tools functions and procedure essential factors to make positive the tools operating in the ideal problem.
after-sale service
We give installation, debugging, servicing, instruction and other companies Supply appropriate technical information, products, application and relevant GMP certification materialsSet up soon after-sales service hotline, and arrange staff to visit clients each 12 months to know a lot more consumer needs,like buyer procedure troubles in the approach of creation products.
top quality assure
Our organization guarantees strictly operate the ISO9001 good quality program certification stXiHu (West EPT) Dis.Hu (West EPT) Dis.rds and pharmaceutical gear GMP audit specifications,promise we offer new equipment. JCEPd EPT,very good good quality.EPT operation risk-free reliable, cost-effective, straightforward to keep.
EPT guarantee time period is one particular yr,all the areas for the equipment select effectively-known brand name.In the course of the warranty when products have issue in good quality like tools failure and injury,EPT for free of charge upkeep or replacement.
We search EPTT to cooperating with partners from all over the globe to develop win-earn cooperation partnership in EPTT phrase. Welcome for your checking out.
Previous EPTT
FAQ:
1. Q: Remember to explain your warranty time period.
A: 15 months after the gear is arrived at the destination port or 12 months following the installation and commissioning of the gear, whichever comes 1st.
2. Q: Do you supply on-website installation and commissioning?
A: Of course, we do. If on request, we are going to offer the assistance of on-site set up and commissioning. Typically a single mechanical engineer and one EPT engineer to aid.
3. Q: How about the EPT of on-web site installation and commissioning direction?
A: The EPT consists of round-trip air tickets, space and board costs, service EPT (labor EPT), and internet site transportation (or right provided by client), which shall be paid out in addition.
4. Q: Are you a factory or a investing business?
A: We are a skilled company. We have possess manufacturing unit and pilot EPTT for clients to do sample screening.