With in depth requirments, we can also build your special developed product. EPG has set up a complete established of top quality administration method which is presented with innovative inspection and test equipment. With numerous years’ encounter in this line, we will be reliable by our benefits in aggressive cost, one particular-time delivery, prompt reaction, on-hand engineering assistance and good soon after-sales solutions.Additionally, all our generation processes are in compliance with ISO9001 standards.
Solution Description:
EPT | Ductile forged iron conforming to ASTM A-536, Grade 65-45-12 |
Surface area Therapy | Epoxy powEPTTcoating (Pink coloration- RAL3000 Orange)Optional: Galvanized (Zinc Plated, EPTTG Or DIP painted) |
Dimension | 1 quot-twelve quot |
Functioning Force | 300PSI |
Cerification | ISO 9001: 2008, FM, UL, CCC and CE approved |
EPT End Kind | Grooved stop, Thread conclude |
EPTT | EPTT |
Payment | By T/T, L/C |
Structure type | one) Rigid Coupling, FleXiHu (West EPT) Dis.ble Coupling, Decreasing FleXiHu (West EPT) Dis.ble Coupling |
2) EPTT Radius and Brief Radius Elbow (90 deg/forty five deg/22.5 deg/11.25 deg) | |
3) Equivalent Tee, Grooved Minimizing Tee, Grooved Reduing Tee(Threaded outlet) | |
four) Grooved EPT Tee, Grooved EPT Cross | |
5) Equal Cross, Grooved Minimizing Cross | |
six) Grooved EPTT, Threaded EPTT | |
seven) Adapter Flange, Grooved SpEPTT Flange | |
8) Cap, Finish Cap |
Merchandise Process
EPTT Data
JiXiHu (West EPT) Dis.ang EPTT Manufacturing unit has a full established of casting, machining, coating, rubber, tests and other production and quality tests system. The top items of EPT are grooved pipe fittings and equipment, from the JCEP States, mixed with the real, in rigid accordance with the ISO9001 international top quality management method to organize manufacturing, the products have handed the nationwide fastened EPT extinguishing and EPT supervision and inspection cEPTTr, the mechanical component of EPTT items testing cEPTTr and a number of authoritative office screening and certification, all in accordance with the countrywide stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd GB5135.
Our Certification
EPTT and Shipment
FAQ
Q: Are you trading organization or company?
A: We are a manufacturing facility.
Q: How EPTT is your shipping and delivery time?
A: EPTTly 15 daEPTTafter the down payment. OEM thirty to 90 days.
Q: Do you offer samples? Is it free or extra?
A: Of course, we could offer you the sample for totally free demand but do not spend the EPT of freight.
Q: What is your conditions of payment?
A: Payment lt=1000USD, 100% in EPT.
Payment gt=1000USD, 30% T/T in EPT ,stability before shippment.
If you have yet another concern, pls feel cost-free to make contact with us.